|
At Southern
Pump Services Engineering Limited, we
provide not only routine
packaged pump station maintenance contracts but also 24hrs emergency breakdown, repair, refurbishment and servicing, we provide this service to both exsisiting packaged pumping stations and other packaged pump station manufacturers equipment.
We
can allow for two
or four visits per
year consisting of
one major service and up to
three general services,
we can also included
within the schedule maintenance for additional works to included jetting, degreasing, sump cleaning
and tankering your
packaged pumping station once a year.
The
scheduling of any
visits will be arranged
at your convenience
and completed within
the arranged calendar
month.
To With upto a 22 point check list is on every major serivce visit and 16 point check on every minor service visit, details
can be found below
on our packaged pump station
maintenance schedule.
Packaged Pump Station - SPSE Major
Service
1.
Lift submersible pump(s), clean
pump and check pump
data plate
2.
Check pump volute
for damage
3.
Check impeller for
debris and damage
unblock if required
4.
Check wear ring(s)
for damage
5.
Assess motor / pump
bearing condition
6.
Remove oil drain
plug and check oil
for water ingress
(where appropriate)
7.
Refit oil drain plug
with new "O" ring
refill / replace
oil (where appropriate)
8.
Check motor windings
for continuity and
insulation integrity
9.
Check motor cables
for wear and water
ingress
10.
Check and clean level
control floats /
ultrasonic head
11.
Check condition /
serviceability of
pump lifting system
12.
Check operation of
isolation and reflux
valves
13.
Check condition of
packaged station wet well pipework
14.
Check condition of
wet well and valve
chamber (where appropriate)
including access
covers
15.
Check condition /
serviceability of
pump control panel
16.
Check and adjust
all pump controls
where necessary
17.
Check and test all
safety / alarm facilities
18.
Check earth loop
resistance
19.
Clean control panel
20.
Check condition of
control panel kiosk
(where appropriate)
21.
Clean and remove
potential items to
cause pump blockages
from pump chamber
22. Jetting, degreasing, sump cleaning
and tankering if required (at an additional cost)
Check
correct operation
of packaged pump station
and replace any consumable
items up to the value
of £150.00,
e.g. Level control
floats, control panel
fuses, indicator
bulbs etc;
to be
invoiced in separately
Record
all collected data
and report on any
areas requiring
attention
Packaged Pump Station - SPSE General
Service
1.
Visually inspect
pumps for correct
operation / damage
2.
Assess motor / pump
bearing condition
3.
Check motor windings
for continuity and
insulation integrity
4.
Check motor cables
for wear and water
ingress
5.
Check level control
floats / ultrasonic
head
6.
Check condition of
pump lifting system
7.
Check operation of
isolation and reflux
valves
8.
Check condition of
wet well pipework
9.
Check condition of
wet well and valve
chamber (where appropriate)
10.
Check condition /
serviceability of
pump control panel
11.
Check and adjust
all pump controls
where necessary
12.
Check and test all
safety / alarm facilities
13.
Check earth loop
resistance
14.
Check condition of
control panel kiosk
(where appropriate)
15.
Clean and remove
potential items to
cause pump blockages
from pump chamber
16. Jetting, degreasing, sump cleaning and tankering if required (additional cost)
Check
correct operation
of packaged pump station
and replace any consumable
items up to the value
of £150.00,
e.g. Level control
floats, control panel
fuses, indicator
bulbs etc;
to be
invoiced in separately
Record
all collected data
and report on any
areas requiring
attention
|