Pump Station Maintenance
At Southern Pump Services Engineering Limited, we provide not only routine pump maintenance contracts but also emergency breakdown and repair, we can provide this service to both exsisiting pumping stations and other manufacturers.
We allow for two or four visits per year consisting of a major and up to three general services, we can also included for jetting, cleaning and tankering your station once a year.
The scheduling of any visits will be arranged at your convenience and completed within the arranged calendar month.
with upto a 21 point check list is on every serivce visits, details can be found below on our submersible pumping station maintenance schedule.
Major Service
- Lift pump(s), clean pump and check pump data plate
- Check pump volute for damage
- Check impeller for debris and damage unblock as required
- Check wear ring(s) for damage
- Assess motor / pump bearing condition
- Remove oil drain plug and check oil for water ingress (where appropriate)
- Refit oil drain plug with new "O" ring refill / replace oil (where appropriate)
- Check motor windings for continuity and insulation integrity
- Check motor cables for wear and water ingress
- Check and clean level control floats / ultrasonic head
- Check condition / serviceability of pump lifting system
- Check operation of isolation and reflux valves
- Check condition of wet well pipework
- Check condition of wet well and valve chamber (where appropriate) including access covers
- Check condition / serviceability of pump control panel
- Check and adjust all pump controls where necessary
- Check and test all safety / alarm facilities
- Check earth loop resistance
- Clean control panel
- Check condition of control panel kiosk (where appropriate)
- Clean and remove potential items to cause pump blockages from pump chamber
Check correct operation of pumping station and replace any consumable items up to the value of £150.00, e.g. Level control floats, control panel fuses, indicator bulbs etc; to be invoiced in separately
Record all collected data and report on any areas requiring attention
General Service
- Visually inspect pumps for correct operation / damage
- Assess motor / pump bearing condition
- Check motor windings for continuity and insulation integrity
- Check motor cables for wear and water ingress
- Check level control floats / ultrasonic head
- Check condition of pump lifting system
- Check operation of isolation and reflux valves
- Check condition of wet well pipework
- Check condition of wet well and valve chamber (where appropriate)
- Check condition / serviceability of pump control panel
- Check and adjust all pump controls where necessary
- Check and test all safety / alarm facilities
- Check earth loop resistance
- Check condition of control panel kiosk (where appropriate)
- Clean and remove potential items to cause pump blockages from pump chamber
Check correct operation of pumping station and replace any consumable items up to the value of £150.00, e.g. Level control floats, control panel fuses, indicator bulbs etc; to be invoiced in separately
Record all collected data and report on any areas requiring attention
|